Demurrage vs. Detention: differences, costs and free time

Published 10 NOV 2026Reviewed by the Angotransmad team
IN THIS ARTICLE ▾01Demurrage02Detention03Other related costs04Free time and tariffs05How to avoid additional costs

Demurrage and detention are charges applied by the shipping line when a container is used beyond the agreed free time. They are often confused, but they refer to different periods.

Demurrage

Charge for the time the full container remains at the terminal beyond the free time.

  • Import: from discharge from the vessel until the container leaves the terminal.
  • Export: from the full container's arrival at the terminal until it is loaded on board.

Detention

Charge for the time the container is used outside the terminal beyond the free time.

  • Import: from the full container leaving the terminal until the empty is returned.
  • Export: from the empty being picked up until the full container is delivered to the terminal.

Some shipping lines offer a single free time period covering both charges (merged D&D).

  • Storage: charged by the terminal and may accrue in addition to demurrage.
  • Reefer connection: electrical connection and related services for refrigerated containers, which may be included in the tariff or charged separately.

Demurrage free time does not guarantee exemption from storage or reefer connection charges.

Free time and tariffs

Free days, counting rules and rates depend on the shipping line, port, container type and contract terms. Rates may increase progressively.

How to avoid additional costs

  • Confirm the free time at booking and, if needed, negotiate additional days.
  • Prepare documentation and customs clearance in advance.
  • Plan inland transport and loading or unloading operations.
  • Return the empty container to the depot nominated by the shipping line, within the deadline.
  • For reefers, confirm whether electrical connection costs are included in the agreed terms.
SOURCESFederal Maritime Commission · Demurrage and DetentionTarifas de demurrage e detention publicadas por cada armador (a confirmar por operação)
READ NEXT
What happens when a vessel skips a scheduled port call?Why doesn't a container always go on the first available vessel?Can cargo be cleared by customs and still held at the terminal?